North Group carried out part of the internal fit-out works at Marischal Square, Aberdeen.
North Group’s on-site joinery team were involved in the installation of the drylining system throughout both office blocks, as well as the internal doors and ironmongery in hotel and office blocks.
Our in-house design team worked alongside the joinery workshop to design, manufacture and install the new reception desks in the reception areas of the office blocks.
We were delighted to be involved in such a high profile project, which reflects the strength of their team, both on-site and in-house.